Public Works

Peeler Road Sidewalk Project

Equestrian Way to Cherring Lane

The city is preparing to construct a sidewalk on the south side of Peeler Road between Equestrian Way and the existing sidewalk near Cherring Lane.  The project will also include drainage improvements, bicycle lanes on both sides of Peeler Road and marked crosswalks at DeKalb Drive and Cherring Drive that connect to Brook Run Park.    Links to the concept plan for the project can be found on the right side of this webpage.  The final construction plans utilize the existing Brook Run shared use path as the sidewalk connection between Cherring Drive and Cherring Lane.

This city is currently advertising to receive construction bids for the project.  Construction is expected to begin in the summer of 2020 with the city’s contractor beginning construction shortly thereafter.  The sidewalk and final paving is projected to be completed in the spring of 2021.